العودة للملف الشخصي

لوحة التحليلات

غافل كريم أسود فرج الجبوري

المقالات
٤٥
الاستشهادات
١٦٠
H-Index (GS)
٧
H-Index (Scopus)
٦

Google Scholar

H-Index٧
الاستشهادات١٥٨
الوثائق٢٧

Scopus

H-Index٦
الاستشهادات٧٢
الوثائق٢٠

Web of Science

H-Index٠

المنشورات حسب السنة

اتجاه مؤشر H

اتجاه الاستشهادات

أكثر المقالات استشهادًا

1

Application of artificial neural networks in predicting subbase CBR values using soil indices data

IOP Conference series: materials science and engineering 671 (1), 012106, 20202020
45 استشهاد
2

PRODUCTIVITY ESTIMATION MODEL FOR BRACKLAYER IN CONSTRUCTION PROJECTS USING NEURAL NETWORK

Al-Qadisiyah Journal For Engineering Sciences2016
29 استشهاد
3

Modeling the water quality index and climate variables using an artificial neural network and non-linear regression

Int J Eng Technol 7, 1346-1350, 20182018
14 استشهاد
4

Investigating factors affecting feasibility study of construction projects in Iraq

Periodicals of Engineering and Natural Sciences 7 (3), 20192019
12 استشهاد
5

Enhancing sewage pipeline project cost estimations in Iraq through artificial neural network models

IOP Conference Series: Earth and Environmental Science 1374 (1), 012086, 20242024
10 استشهاد
6

Factors affecting safety in construction projects

International Review of Civil Engineering 11 (3), 135-140, 20202020
8 استشهاد
7

Forecasting construction time for road projects and infrastructure using the fuzzy PERT method

IOP conference series: materials science and engineering 1076 (1), 012123, 20212021
7 استشهاد
8

Forecasting the final cost of Iraqi public school projects using regression analysis

Engineering and Technology Journal 33 (2), 477-486, 20152015
7 استشهاد
9

modeling final costs of Iraqi public school projects using neural networks

International Journal of Civil Engineering and Technology 5 (7), 42-54, 20142014
6 استشهاد
10

Developing a Sustainability Assessment System for an Educational Building in the Iraqi Environment

Tikrit Journal of Engineering Sciences 31 (4), 25-33, 20242024
6 استشهاد